top of page
Lake County Highway Building
Description: New Construction
Building Size: 54,000 square feet
Year Constructed: 2019
Location: Two Harbors, MN
Architect: CBS Squared, Inc
Chippewa Falls, WI
APEX Design Services:
HVAC
Plumbing
Electrical
Features:
-
Variable Refrigerant Flow (VRF) system with high efficiency boilers and fluid cooler
-
High efficiency, low temperature boiler heating systems
-
Hot water in-floor heating throughout wash bay and maintenance repair areas. Slab tempering provided around perimeter of office area
-
Overhead radiant heat in vehicle storage areas
-
Air-to-air energy recovery unit for office area ventilation and restroom exhaust
-
Vehicle areas provided with central exhaust and ventilation systems with automatic controls
-
Fabric air dispersion systems in storage and maintenance areas
-
Energy efficient ceiling fans in high-bay areas to eliminate air stratification issues.
-
Exhaust fans utilize Electronically Commutated (EC) motors
-
LED interior lighting
-
LED exterior lighting
-
Fire alarm system
-
Emergency and optional standby power systems
-
Fire protection system
-
Truck/Vehicle washing and detailing system
-
Natural gas and compressed air systems
-
High efficiency gas-fired domestic water heaters
bottom of page