Luck Public Library & Museum

Description:  New Construction

Building Size:  7,000 square feet

Year Constructed:  2008

Location:  Luck, WI

Architect:  Cedar Corporation

                    Menomonie, WI

APEX Design Services:

HVAC

Plumbing

Features:

  • High efficiency gas-fired furnaces with split system cooling, zoning system and humidification

  • High efficiency, low temperature boiler system for in-floor slab tempering around perimeter of library

  • Air-to-air energy recovery unit for building  ventilation and restroom exhaust

  • Natural gas system

  • Electric domestic water heater

AFFILIATIONS

Chippewa Falls Area Chamber Logo.png
ICC_Box_RGB_HIRES_edited.jpg
NFPA%20member%20logo%202019-2020_edited.
© 2020 Unauthorized use and or duplication of this material without express and/or written permission from our firm is strictly prohibited.
aspe%2520logo_edited_edited.png
logo_ashrae_edited.png

NSPE-WI

AFE