Osseo-Fairchild High School

Description:  Addition and Remodel

Building Size:  110,000 square feet (addition)

Year Constructed:  2001

Location:  Osseo, WI

Architect:  PMSI

                    Eau Claire, WI

APEX Design Services:

HVAC

Plumbing

Electrical

Features:

  • Phased project over two school years

  • All new systems throughout remodeled areas

  • Hot water heating and chilled water cooling systems throughout

  • High efficiency boilers in primary-variable flow configuration

  • Air-cooled, variable speed screw chiller

  • Variable Air Volume (VAV) systems

  • New electrical service

  • All new storm and drainage systems

  • New utilities

AFFILIATIONS

Chippewa Falls Area Chamber Logo.png
ICC_Box_RGB_HIRES_edited.jpg
NFPA%20member%20logo%202019-2020_edited.
© 2020 Unauthorized use and or duplication of this material without express and/or written permission from our firm is strictly prohibited.
aspe%2520logo_edited_edited.png
logo_ashrae_edited.png

NSPE-WI

AFE